Manufacturing Costing BOM – Advanced Excel File
156.65 $
Manufacturing Costing System: Covers version-controlled BOMs, production orders, WIP, standard cost setup, and variance analysis for materials, labor, and overhead. Delivers unit cost and variance reporting by order/product for a controlled monthly production close.
Advanced Manufacturing Costing Package
BOM + Production Orders + Standard Cost + Variance Analysis + WIP Reconciliation (Manufacturing Closing Pack)
Value Proposition: The Manufacturing Costing System package connects production data (BOM + Production Orders + Material Issues + Finished Goods Receipts) to the GL, producing WIP Reconciliation + COGM/COGS Schedules + Variance Analysis + a traceable Closing Pack at Month-End and Year-End.
In 20 seconds: What will you get?
- BOM Cost Roll-up templates for calculating Standard Cost (Materials/Labor/Overhead) at the product level.
- Production Order Cost Sheet: Order cost (Issued Materials + Labor/Overhead) + Closure status.
- WIP Reconciliation: Linking WIP Sub-ledger/Reports with WIP accounts in GL + variance explanations.
- Variance Analysis: Material variances (Price/Usage) + Labor (Rate/Efficiency) + Overhead (Spending/Volume).
- COGM Schedule (Cost of Goods Manufactured) + COGS linkage to sales (based on delivery/shipping data).
- Exception Log: Unclosed orders, missing issues, unpriced receipts, Negative/Zero Cost, loading variances.
- Manufacturing Closing Pack Template: Indexed delivery for internal/external review (Traceability).
CTA related to outputs: Start Month-End with a path that concludes with WIP Reconciliation and Variance Reports and COGM/COGS Schedules within the Closing Pack.
Suitable for
- Cost Accountant needing Standard Cost + Variance Analysis monthly.
- GL Lead wanting to close WIP and COGM with clear linkage to GL.
- Financial Controller needing a delivery file for review that explains cost variances instead of aggregated numbers.
Not Suitable for
- Workshops/Simple manufacturing that does not use BOM or Production Orders and lacks extractable material movements.
- Manufacturing Process Costing with joint products or industries requiring highly advanced chemical costing models/mixing stages (for which there are specialized packages).
Without the Package / With the Package (Short Comparison)
| Item | Without the Package | With the Package |
|---|---|---|
| Standard Cost | Undocumented or outdated standard cost when BOM/prices change | Cost Roll-up + Standard Cost Update Log + Impact of updates |
| WIP | WIP number in GL without linkage to Production Orders/material movements | WIP Reconciliation linking Orders/Reports with GL + variance explanations |
| Variances | Variances appear at year-end without breakdown (Material/Labor/OH) | Variance Analysis (Price/Usage/Rate/Efficiency/Volume) + Issue Log |
| COGM/COGS | COGS “closing number” without linkage to finished goods/material issues | COGM Schedule + linkage to inventory/delivery + support for variances |
| Delivery | Scattered attachments (BOM/Orders/Costs) without indexing | Indexed Manufacturing Closing Pack + Support Index |
Before Use: 5 Symptoms Indicating a Faulty Costing System
- Recurring discrepancies between WIP in production reports and WIP accounts in GL at Month-End.
- Production Orders closing without complete material issues (missing Issued Materials) or unpriced finished goods receipts.
- Standard Cost not updated after BOM/material price changes, resulting in variances without explanation.
- Overhead loading done “at a general rate” without an Absorption Rate schedule or without Spending/Volume analysis.
- COGM/COGS cannot be linked to movements: no Cost Sheet for each order and no exception log for open orders.
Manufacturing Costing System: Implementation Method (3 Steps Without Gaps)
Step 1: Preparation and Report Gathering
- Prepare Item Master + BOM + (if applicable) Routings/Work Centers + define cost centers/Overhead loading centers.
- Extract Production Orders for the period (Open/Closed) + Material Issues + Finished Goods Receipts + Returns/Adjustments.
- Extract relevant GL balances: Raw Materials / WIP / Finished Goods / COGS + Variance/Overhead accounts.
Step 2: Standard Cost + Order Closures + WIP Reconciliations
- Execute Cost Roll-up to establish Standard Cost (Materials/Labor/Overhead) and record any updates in the Standard Cost Update Log.
- Prepare Production Order Cost Sheets: link Issued Materials and Labor/Overhead with the order, then determine closure status (Complete/Partial/Backflush according to your system).
- Execute WIP Reconciliation: Orders/Sub-ledger vs GL + aggregate variances in the Exception Log and identify their cause (Cut-off/Pricing/Missing Issues/Open Order).
Step 3: Variance Analysis + COGM/COGS + Manufacturing Closing Pack
- Generate Variance Analysis (Material/Labor/Overhead) with breakdowns of Price/Usage/Rate/Efficiency/Volume based on available data.
- Produce COGM Schedule and link it to the increase in finished inventory/delivery, then link COGS to sales/shipments (according to your system).
- Compile Manufacturing Closing Pack: Standard Cost + Orders Costing + WIP Reconciliation + Variances + COGM/COGS + Support Index + Sign-off.
Package Components (Clear Inventory)
-
BOM & Routing Control Pack
- Practical Purpose: Control BOM data (components/quantities/waste) and link it to the product to avoid “illogical” Standard Cost.
- When to Use: At setup + whenever there is a BOM/component/alternative change.
- Resulting Guide: BOM Review Checklist + Change Log (BOM Change Log).
-
Standard Cost Roll-up + Update Log
- Practical Purpose: Establish/update Standard Cost (Materials/Labor/Overhead) and document “when and why the cost changed.”
- When to Use: Monthly or when there are price/component changes + before Month-End if there is a significant update.
- Resulting Guide: Cost Roll-up Schedule + Standard Cost Update Log + Impact of updates.
-
Production Order Cost Sheet
- Practical Purpose: Cost of the production order at the level of (Issued Materials + Labor + Overhead) with closure status.
- When to Use: Throughout the month + final close at Month-End/Year-End.
- Resulting Guide: Cost Sheet for each Order + List of incomplete/unclosed Orders.
-
WIP Reconciliation Workbook
- Practical Purpose: Match WIP Sub-ledger/Orders with WIP in GL and show pricing/cut-off/open order variances.
- When to Use: Every Month-End, with a broader scope at Year-End.
- Resulting Guide: WIP Reconciliation + Variance Explanations + (if necessary) proposed documented adjustment entries.
-
Overhead Absorption & Allocation Schedule
- Practical Purpose: Establish a method for Overhead loading (loading rate/Driver) and link what has been loaded to variances.
- When to Use: Monthly + annual review of loading rates (according to factory policy).
- Resulting Guide: Absorption Schedule + linkage to Overhead/Variance accounts in GL.
-
Variance Analysis Pack
- Practical Purpose: Break down variances instead of a single number: Material (Price/Usage) + Labor (Rate/Efficiency) + Overhead (Spending/Volume).
- When to Use: Every Month-End + annual trend analysis at Year-End.
- Resulting Guide: Variance Reports + Issue Log detailing the source of variance (Data/Operations/Loading).
-
COGM/COGS Schedules
- Practical Purpose: Convert production and orders into financial statement numbers: Cost of Goods Manufactured then link it to COGS based on delivery/sales.
- When to Use: Monthly (Month-End) + annually (Year-End) as part of financial statement delivery.
- Resulting Guide: COGM Schedule + COGS Linkage + References for orders/inventory.
-
Manufacturing Month-End Checklist + Closing Pack Template
- Practical Purpose: Transform cost closure into a task sequence + indexed delivery that reduces search time on request.
- When to Use: Every Month-End, with expanded delivery at Year-End.
- Resulting Guide: Completed Checklist + Closing Pack Index + Support Index + Sign-off.
You will exit Month-End with WIP Reconciliation + Variance Analysis + COGM/COGS within the Manufacturing Closing Pack.
What should be included in the delivery?
- Master Data Section: Item Master + BOM + (if applicable) Routings/Work Centers + definition of Drivers for Overhead loading.
- Standard Cost Section: Cost Roll-up + Standard Cost Update Log + approved Standard Cost version for the period.
- Production Orders Section: List of Orders (Open/Closed) + Cost Sheets + Exceptions (unclosed orders/missing issues/unpriced receipts).
- WIP Section: WIP Reconciliation (Orders/Sub-ledger vs GL) + Variance Explanations + any documented entries/adjustments.
- Overhead Section: Absorption/Allocation Schedule + linkage of loading to GL accounts + any loading variances.
- Variances Section: Material/Labor/Overhead Variance Reports + Issue Log detailing the reason and corrective action.
- COGM/COGS Section: COGM Schedule + linkage to finished inventory + COGS linkage to delivery/sales.
- Support Index Section: Indexing attachments linking each schedule to the source (Reports/Orders/Movements) for easier Traceability.
- Sign-off Section: Approved version for the period + scope of factory/lines/warehouses + who approved + date of approval.
After Implementation (Two Points Only)
- Operational Outcome for the Team: Month-End becomes a fixed path: Standard Cost → Orders Costing → WIP Reconciliation → Variances → COGM/COGS, reducing “pending” orders and incomplete pricing.
- Control/Audit Outcome: Traceability: WIP and COGS numbers can be traced back to Orders/Cost Sheets and Variance Reports with Support Index within the Closing Pack instead of relying on aggregated numbers.
FAQ — Questions Before Purchase
Is the package suitable for any ERP/MRP?
Yes, provided the system outputs: BOM/Items, Production Orders, Material Issues/FG Receipts, and inventory/GL reports. The approach relies on data, not on the system name.
Does it support multiple factories or production lines?
Yes. The same Workpapers can be applied to each Plant/Line and then compile a monthly Summary while maintaining a Closing Pack for each scope or a unified Pack according to your reporting policy.
Does it work with Standard Cost only or Actual Cost as well?
The approach is based on Standard Cost + Variances (to show deviations). If your system is Actual-only, the Orders Costing, WIP Reconciliation, and COGM/COGS templates are used, while the Variances part depends on the availability of a standard/rate for comparison.
Does it fully include WIP?
Yes, from the perspective of Workpapers: WIP Reconciliation + linkage to orders + Cut-off/Pricing/Open Order variances. The accuracy of WIP depends on the discipline of material issues and finished goods receipts within the operating system.
What is the minimum data required to start?
Item Master + BOM (for core products) + List of Orders + Material Issues + Finished Goods Receipts + GL Balances (RM/WIP/FG/COGS) for the period.
Does it include an Overhead loading approach?
It includes an Absorption/Allocation Schedule to establish the Driver and loading rate and link the loading to GL accounts and loading variances. The choice of Driver and rate is made according to your factory’s policy and data.
Is it suitable for Year-End and delivery of reviews?
Yes. The indexed Manufacturing Closing Pack combines: Standard Cost + Orders + WIP Reconciliation + Variances + COGM/COGS + Support Index, making it suitable for internal/external delivery.
Does it fully cover Process Costing?
It focuses on Discrete/Job/Assembly using BOM and Production Orders. Advanced Process Costing (mixing stages/joint products) requires specialized templates.
Ready to close the factory with a traceable costing file?
Outputs: WIP Reconciliation + Variance Analysis + COGM/COGS Schedules + Manufacturing Closing Pack.
| المسمّى الوظيفي | |
|---|---|
| Duration | |
| المستوى | |
| التحديثات | |
| القطاع | |
| الصيغة |

Reviews
Clear filtersThere are no reviews yet.