Digital Salla

Implementing a New Accounting System: Challenges, Risks and Controls

Audit, Governance & Digital Transformation

Design titled "Challenges in Implementing Common Accounting Systems and How to Overcome Them", with a cartoon of a stressed employee at a desk covered in books and scattered papers.

Implementing a new accounting system, or changing the one you have, changes how every transaction is recorded. The risks of changing accounting systems go well beyond screens that do not work: balances migrated incorrectly, access rights wider than needed, changes made without control, and reports nobody can rely on. This article sets out the challenges of implementation and the risks of the change as the professional frameworks describe them — the COSO internal control framework and International Standard on Auditing (ISA) 315 — then the e-invoicing requirements, with the controls that address each risk.

Why changing an accounting system is a control risk

In May 2013 the Committee of Sponsoring Organizations of the Treadway Commission (COSO) issued Internal Control — Integrated Framework, with five components and seventeen principles. Principle 9, under risk assessment, states that the organization identifies and assesses changes that could significantly impact the system of internal control. A new accounting system is one of the clearest such changes, because the controls built into the old system do not move across by themselves.

Your external auditor looks at the year of change the same way. ISA 315 (Revised 2019) Identifying and Assessing the Risks of Material Misstatement, in the 2026 edition of the International Auditing and Assurance Standards Board (IAASB) Handbook:

  • lists, among the matters the auditor may consider when understanding the entity's business risks, the use of IT, such as the implementation of a new IT system that will affect both operations and financial reporting (paragraph A64); and
  • lists, among events and conditions that may indicate risks of material misstatement at the assertion level, changes in the IT environment and the installation of significant new IT systems related to financial reporting (Appendix 2).

If you are changing systems this year, expect questions on migration, access and changes — and keep the evidence from day one.

The risks arising from the use of IT, as ISA 315 lists them

The Standard defines these risks as the susceptibility of information processing controls to ineffective design or operation, or risks to the integrity of information — the completeness, accuracy and validity of transactions and other information — in the entity's information system, due to ineffective design or operation of controls in the entity's IT processes (paragraph 12(i)). Appendix 5 (paragraph 18) gives examples:

  1. Unauthorized access to data that may result in destruction of data or improper changes to data, including the recording of unauthorized or non-existent transactions, or inaccurate recording of transactions. Particular risks may arise where multiple users access a common database.
  2. The possibility of IT personnel gaining access privileges beyond those necessary to perform their assigned duties, thereby breaking down segregation of duties.
  3. Unauthorized changes to data in master files.
  4. Unauthorized changes to IT applications or other aspects of the IT environment.
  5. Failure to make necessary changes to IT applications or other aspects of the IT environment.
  6. Inappropriate manual intervention.
  7. Potential loss of data or inability to access data as required.

In a system implementation project, these risks show up in specific places:

Where the challenge arisesCorresponding risk from the list
Migrating balances and data from the old systemLoss of data; inaccurate recording
Granting access to users and to the implementation teamUnauthorized access; excessive privileges
Setting up customers, suppliers and itemsUnauthorized changes to master files
Customisations and changes after go-liveUnauthorized changes to the application
Manual adjusting entries during the transitionInappropriate manual intervention
Backup and hostingLoss of data or inability to access it

Data migration: the first point of risk

Appendix 5 of ISA 315 lists, among the matters the auditor may consider in understanding the IT environment, whether there was a major data conversion during the period and, if so, the nature and significance of the changes made and how the conversion was undertaken (paragraph 4). Appendix 6 includes data conversion controls — controls over the conversion of data during development, implementation or upgrades — among general IT controls (paragraph 2).

In practice, these controls can be evidenced by straightforward accounting reconciliations:

  • Trial balance: opening balances in the new system equal the closing balances in the old one, account by account, with every difference explained and documented.
  • Subsidiary ledgers: the totals of customer, supplier and inventory balances equal the related control accounts in the general ledger.
  • Master data: no duplicate customers or suppliers, and every change has a requester and an approver.

For the steps, see data migration to a new system; for building the account structure first, see chart of accounts design.

General IT controls in the new system

COSO Principle 11 states that the organization selects and develops general control activities over technology to support the achievement of objectives. Appendix 6 of ISA 315 gives examples of such controls, organized by IT process (paragraph 2):

IT processExample controls
Managing accessAuthentication; authorization limited to job needs, which facilitates segregation of duties; provisioning; deprovisioning on termination or transfer; privileged access; periodic user access reviews; security configuration; physical access to the data center and hardware
Managing program and other changesA change management process to design, program, test and migrate changes to production; segregation of duties over change migration; controls over systems development, acquisition or implementation; data conversion
Managing IT operationsJob scheduling; job monitoring; backup and recovery; intrusion detection

The Standard includes an example that matters for smaller entities. An entity that uses commercial software without access to the source code is unlikely to have a process for program changes, but may have a process or procedures to configure the software (for example, the chart of accounts, reporting parameters or thresholds) and to manage access to it (for example, a designated individual with administrative access). In such circumstances, it is unlikely to have or need formalized general IT controls (paragraph A170). For off-the-shelf software, configuration and access are therefore where control starts.

On protecting the data, see cybersecurity for accountants.

Control activities and information: from policy to system

Three more COSO principles complete the picture, under control activities and under information and communication:

  • Principle 10: the organization selects and develops control activities that contribute to the mitigation of risks to the achievement of objectives to acceptable levels.
  • Principle 12: the organization deploys control activities through policies that establish what is expected and procedures that put policies into action.
  • Principle 13: the organization obtains or generates and uses relevant, quality information to support the functioning of internal control.

In a system project this means a written authority and approval matrix before roles are configured, a list of incompatible duties never given to one user, and approval workflows that match the policy. For designing these procedures, see internal controls and segregation of duties; for the framework as a whole, see the COSO framework and its five components.

People and change: competence, accountability, communication

A system succeeds only through the people who use it, and three COSO principles address this directly:

  • Principle 4: the organization demonstrates a commitment to attract, develop, and retain competent individuals in alignment with objectives.
  • Principle 5: the organization holds individuals accountable for their internal control responsibilities in the pursuit of objectives.
  • Principle 14: the organization internally communicates information, including objectives and responsibilities for internal control, necessary to support its functioning.

Training on a new system is therefore not a tour of the screens: it is the handover of each user's responsibilities in their accounting cycle — who approves what, and when.

E-invoicing: part of system set-up, not a later phase

Where an entity is subject to the e-invoicing requirements of the Zakat, Tax and Customs Authority, those requirements belong in system selection and set-up:

  • Definition: an electronic invoice is a tax invoice generated in a structured electronic format through electronic means. A paper invoice converted into an electronic format by copying, scanning or any similar method is not an electronic invoice.
  • Phase one: enforced as of 4 December 2021 for all taxpayers (excluding non-resident taxpayers) and any parties issuing tax invoices on behalf of VAT-registered suppliers: invoices are issued through a compliant electronic solution, with additional fields depending on the type of transaction.
  • Phase two: from 1 January 2023, in waves: the electronic solution must be integrated with the Authority's systems and e-invoices generated in the required format.

So ask before you sign: is the solution compliant for the phase your entity is subject to, and who will build and test the integration? For the technical detail, see e-invoicing requirements and integration.

When is moving to an ERP the answer?

Some implementation problems arise because the system is smaller than the business, so side spreadsheets and manual reconciliations pile up. The signs are covered in when do you need an ERP system?, and the transition itself, phase by phase, in the guide to a safe transition to ERP systems.

A short pre-go-live checklist

QuestionReference
Have we assessed the change's impact on internal control?COSO, Principle 9
Did the trial balance and subsidiary ledgers reconcile after migration?ISA 315, Appendix 6: data conversion controls
Is access limited to job needs and reviewed periodically?ISA 315, Appendix 6: managing access
Is every change tested before it reaches production?ISA 315, Appendix 6: managing changes
Have backup and recovery been tested?ISA 315, Appendix 6: managing IT operations
Are policies and procedures written before roles are configured?COSO, Principle 12
Is invoicing compliant for the entity's phase?Zakat, Tax and Customs Authority

A practical tool

The Financial Policies and Procedures Manual with Authority Matrix and Internal Controls includes an approval authority matrix for thirty processes, pairs of incompatible duties, a matrix of 52 controls, a register of 29 risks, and procedures for eleven cycles, including document retention and system access rights. It is suggested content to be adapted and approved by the authorised person, not a manual for any particular entity, and it contains no content specific to associations and non-profit entities.

Sources

Blog

A tool for this topic

Apply what you read with a ready file

Governance & Control

Financial Policies and Procedures Manual

A financial policies and procedures manual adapted to the local regulatory environment, with the approval authority matrix, a controls matrix for the accounting cycles, and a risk register.

View details