Design titled "Variance Analysis with Standard Costs: Formulas and a Worked Example", showing a computing the variances card (material price marked favourable; material usage, labour rate and labour efficiency marked adverse), a card reconciling budgeted profit of 150,000 to actual profit of 139,030 (sales volume variance (6,000), sales price variance 9,600, cost variances (14,570)), and favourable and adverse badges.

Variance analysis compares actual costs and revenues with what they should have been under the standards or the budget, then breaks the total difference down into its causes: did we pay a different price, use a different quantity, or sell a different volume? It is used mainly by manufacturers that run a standard costing system, so that accountants and managers know where each difference came from and who should follow it up.

No IFRS Accounting Standard prescribes how to analyse variances: the formulas below are management accounting conventions, not requirements. Standard costs themselves, however, reach the financial statements. IAS 2 Inventories allows techniques such as the standard cost method to be used for convenience if the results approximate cost. Standard costs take into account normal levels of materials and supplies, labour, efficiency and capacity utilisation; they are regularly reviewed and, if necessary, revised in the light of current conditions (IAS 2.21).

The right baseline: standard cost of actual output

A static budget is built for one planned volume. Comparing its costs with the costs of a different actual volume mixes the effect of volume with the effects of price and efficiency. The correct baseline for cost variances is the flexible budget: standard quantity per unit × units actually produced × standard price. The difference between the two is covered in types of budgets.

A common mistake: a budget of 1,000 units at a cost of 60 each (60,000) against actual output of 900 units at 64 each (57,600). The 2,400 difference looks favourable, but it misleads:

ComparisonStandardActualVariance
Static budget (1,000 units)60,00057,6002,400 favourable
Flexible budget (900 units × 60)54,00057,6003,600 adverse

The 3,600 adverse is the flexible-budget variance, 900 × (64 − 60): what the actual output cost above its standard, which is then split into price and quantity once the inputs are known. The remaining 6,000 (100 units × 60) is a volume effect because output fell — not efficiency. Efficiency can only be measured by comparing actual inputs (kilograms or hours) with the standard inputs for actual output. How the standards are set is explained in standard costing.

Favourable and adverse variances

ItemFavourableAdverse
CostsActual below standardActual above standard
Selling price and sales volumeActual above planActual below plan

"Favourable" describes the direction of the effect on profit, not the quality of performance. A cheaper material gives a favourable price variance and may bring an adverse usage variance with it if its quality is lower. In the formulas below, the terms are ordered so that a positive result is favourable and a negative one adverse.

Direct materials: price and usage

  • Material price variance = (standard price − actual price) × actual quantity.
  • Material usage variance = (standard quantity for actual output − actual quantity used) × standard price.

The price variance is computed either at purchase, on the quantity bought — so raw materials are carried at standard price — or at issue, on the quantity used. Questions about it usually go to purchasing and the market; the usage variance points to production: waste, rework or material quality. The three cost elements are covered in elements of manufacturing costs.

Direct labour: rate and efficiency

  • Labour rate variance = (standard rate − actual rate) × actual hours.
  • Labour efficiency variance = (standard hours for actual output − actual hours) × standard rate.

When hours paid differ from hours worked, idle time is shown as a separate variance at the standard rate and efficiency is measured on hours worked. A rate variance may reflect overtime premiums or a different skill mix; an efficiency variance reflects the time taken per unit.

Production overhead variances

Variable overhead

  • Spending variance = (actual hours × standard variable rate) − actual variable overhead.
  • Efficiency variance = (standard hours − actual hours) × standard variable rate.

If overhead is absorbed on direct labour hours, this efficiency variance moves with labour efficiency, because the same extra hours attract extra variable overhead.

Fixed overhead

  • Spending (expenditure) variance = budgeted fixed overhead − actual fixed overhead.
  • Volume variance = (actual output × standard fixed overhead per unit) − budgeted fixed overhead. It splits into an efficiency variance = (standard hours − actual hours) × fixed absorption rate, and a capacity variance = (actual hours − budgeted hours) × fixed absorption rate.

The fixed absorption rate links directly to IAS 2. The allocation of fixed production overheads to the costs of conversion is based on the normal capacity of the production facilities — the production expected to be achieved on average over a number of periods or seasons under normal circumstances, taking into account the loss of capacity from planned maintenance. The actual level of production may be used if it approximates normal capacity (IAS 2.13).

The same paragraph adds three rules:

  • The fixed overhead allocated to each unit is not increased as a consequence of low production or idle plant; unallocated overheads are recognised as an expense in the period in which they are incurred.
  • In periods of abnormally high production, the fixed overhead allocated to each unit is decreased so that inventories are not measured above cost.
  • Variable production overheads are allocated to each unit on the basis of the actual use of the production facilities.

So if the standard absorption rate is set on normal capacity, an adverse volume variance caused by output below that capacity is unallocated fixed overhead, which belongs in expenses rather than inventory. For fixed versus variable costs, see cost behaviour.

Sales and marketing cost variances

  • Sales price variance = (actual selling price − standard selling price) × actual quantity sold.
  • Sales volume variance = (actual quantity sold − budgeted quantity) × standard profit per unit under absorption costing, or × standard contribution per unit under marginal costing.

Valuing the volume variance at selling price works for analysing revenue alone. In a statement reconciling budgeted profit to actual profit, it is valued at profit or contribution, because the cost of the extra or missing units is removed through the flexible budget; otherwise the reconciliation does not hold. Under marginal costing there is no fixed overhead volume variance: fixed overhead is compared with its budget directly. With several products, the volume variance splits into mix and quantity variances. For the marginal basis, see contribution margin.

Marketing and selling costs are compared with a flexible budget at actual sales volume for their variable part, and with the budgeted amount for their fixed part. Selling costs are among the examples of costs excluded from the cost of inventories and recognised as expenses in the period in which they are incurred (IAS 2.16), so their variances hit the period's profit directly and never pass through inventory.

A complete worked example (illustrative figures)

Assumptions: one product; absorption costing. Production equals sales, so there is no opening or closing inventory, and materials purchased equal materials used. Overheads are absorbed on direct labour hours. Budgeted output of 5,000 units equals normal capacity (10,000 hours). Selling and administrative expenses are ignored.

Standard cost card per unit

ElementStandard quantityStandard priceCost
Direct materials4 kg5.0020.00
Direct labour2 hours15.0030.00
Variable overhead2 hours4.008.00
Fixed overhead2 hours6.0012.00
Standard cost70.00

Fixed absorption rate = budgeted fixed overhead 60,000 ÷ 10,000 hours = 6.00 per hour. The standard selling price is 100, so standard profit is 30 per unit and budgeted profit is 5,000 × 30 = 150,000.

Actual results

ItemActual
Units produced and sold4,800 at a price of 102 (revenue 489,600)
Materials19,800 kg costing 97,020 (4.90 per kg)
Labour9,900 hours costing 153,450 (15.50 per hour)
Variable overhead38,600
Fixed overhead61,500

Standard for actual output: materials 4,800 × 4 = 19,200 kg; hours 4,800 × 2 = 9,600.

Computing the variances

VarianceComputationAmountDirection
Material price(5.00 − 4.90) × 19,8001,980Favourable
Material usage(19,200 − 19,800) × 5.003,000Adverse
Labour rate(15.00 − 15.50) × 9,9004,950Adverse
Labour efficiency(9,600 − 9,900) × 15.004,500Adverse
Variable overhead spending(9,900 × 4.00) − 38,6001,000Favourable
Variable overhead efficiency(9,600 − 9,900) × 4.001,200Adverse
Fixed overhead spending60,000 − 61,5001,500Adverse
Fixed overhead volume(4,800 × 12.00) − 60,0002,400Adverse
Sales price(102 − 100) × 4,8009,600Favourable
Sales volume(4,800 − 5,000) × 306,000Adverse

The fixed overhead volume variance splits into efficiency, (9,600 − 9,900) × 6.00 = 1,800 adverse, and capacity, (9,900 − 10,000) × 6.00 = 600 adverse.

Reconciling budgeted and actual profit

ItemAmount
Budgeted profit150,000
Sales volume variance(6,000)
Sales price variance9,600
Cost variances: 2,980 favourable − 17,550 adverse(14,570)
Actual profit139,030

Check: revenue 489,600 − actual costs (97,020 + 153,450 + 38,600 + 61,500 = 350,570) = 139,030.

Reading: raising the price by 2 earned 9,600 favourable, alongside 200 fewer units sold (6,000 adverse), so the two are studied together. The cheaper material (1,980 favourable) came with 600 kg of extra usage (3,000 adverse). The biggest operating message is the extra time: 300 hours cost 4,500 in labour efficiency, 1,200 in variable overhead efficiency and 1,800 in fixed overhead efficiency — 7,500 in total.

Closing variances and the financial statements

In a standard costing system, production, inventory and cost of sales are recorded at standard, and variances accumulate in separate accounts that are closed at the period end. In the example all output was sold, so every variance is closed to cost of sales:

AccountDebitCredit
Cost of sales14,570
Material price variance1,980
Variable overhead spending variance1,000
Material usage variance3,000
Labour rate variance4,950
Labour efficiency variance4,500
Variable overhead efficiency variance1,200
Fixed overhead spending variance1,500
Fixed overhead volume variance2,400
Total17,55017,550

Cost of sales becomes 4,800 × 70 = 336,000 at standard + 14,570 = 350,570 — exactly the actual costs.

When part of the output remains in inventory, these points shape the treatment:

  1. The approximation condition: IAS 2 does not prescribe how to close variances, but it permits the standard cost method only if the results approximate cost (IAS 2.21). Closing variances to cost of sales works while inventory at standard still approximates cost. If they are material, one cost accounting method, which IAS 2 does not prescribe, is to allocate them between inventory and cost of sales to the extent needed to bring inventory back to approximately cost.
  2. What never enters inventory: fixed overhead left unallocated because of low production or idle plant is an expense of the period (IAS 2.13). Abnormal amounts of wasted materials, labour or other production costs are excluded from the cost of inventories and expensed in the period (IAS 2.16). An adverse usage variance is not automatically abnormal waste; judge it by its cause. See scrap and spoilage treatment.
  3. No inventory above cost: in periods of abnormally high production, the fixed overhead allocated to each unit is decreased so that inventories are not measured above cost (IAS 2.13). If the rate is set on normal capacity, the favourable fixed overhead volume variance is then not closed entirely to cost of sales: part of it reduces the cost of the units still in inventory.
  4. Reviewing standards: out-of-date standards make variances measure the standard's error rather than performance. IAS 2 describes standard costs as regularly reviewed and, if necessary, revised in the light of current conditions (IAS 2.21).

Interpreting and following up variances

  1. Check the baseline first: is actual output right, and is the standard current? An error in either creates a variance that does not exist.
  2. Read the pairs together: material price with usage, labour rate with efficiency, selling price with sales volume. The favourable side of one is often the cause of the adverse side of the other.
  3. Assign each variance to whoever controls it: price to purchasing, usage and efficiency to production, selling price and volume to sales. The capacity variance relates to production planning and demand, so it should not be charged to production alone.
  4. Separate one-offs from structural shifts: a one-off variance is handled operationally. One that recurs because the market or capacity has changed becomes a strategic question — repricing, a new supplier, or a capacity review. See strategic decisions and their financial impacts.

Formula summary

VarianceFormula (positive = favourable)
Material price(standard price − actual) × actual quantity
Material usage(standard quantity for actual output − actual) × standard price
Labour rate(standard rate − actual) × actual hours
Labour efficiency(standard hours − actual) × standard rate
Variable overhead spending(actual hours × variable rate) − actual
Variable overhead efficiency(standard hours − actual) × variable rate
Fixed overhead spendingbudgeted − actual
Fixed overhead volume(actual output × standard fixed cost per unit) − budgeted
Sales price(actual price − standard) × quantity sold
Sales volume(quantity sold − budgeted) × standard profit or contribution per unit

A practical tool

The Cost Accounting for Small Factories tool computes unit cost by process costing: it allocates overheads to production centres, absorbs fixed overheads on normal capacity and shows the unabsorbed part as a period expense. Its outputs include variances from standard: material price and quantity, labour rate and efficiency, and overheads. It covers process costing only, with one operating stage per product, and does not cover per-job costing, joint and by-products, raw materials inventory or the write-down of work in process to net realisable value; spoilage is assumed to be detected at the end of the run.

Sources

  • IFRS Foundation: IAS 2 Inventories. References in brackets are to paragraphs of the Standard. The variance formulas are management accounting conventions that no IFRS Accounting Standard prescribes.

Blog

A tool for this topic

Apply what you read with a ready file

Specialized Sectors

Factory Cost Accounting

Compute your factory's unit cost by process costing (continuous production), allocating overheads to production centers, value finished goods and work in process, and analyze variances.

View details